Thank you for your patience. Some pages may be slower than usual while we make improvements behind the scenes.

Tuesday 21 July 2026
Beta
The Daily Darwin

Darwin Local News · Every Day

property

Lee Point Darwin and The Heights in Durack Offer Buyers Details on New Residential Areas

Master-planned communities in the northern suburbs along with fast-tracked suburbs and Durack stages supply specific timelines and features for home buyers evaluating options.

By Darwin Property Desk · Published 20 July 2026

How we reported this

Produced with AI assistance and reviewed against our editorial and accuracy standards. Spotted an error or need a correction? Contact us.

Lee Point Darwin and The Heights in Durack Offer Buyers Details on New Residential Areas
AI-generated illustration

Lee Point Darwin is advancing as a master-planned seaside residential community in the northern suburbs. The project is set to deliver approximately 800 new homes across 131 hectares and includes a planned tourism precinct with a hotel and retail strip.

Lee Point Darwin

Buyers seeking seaside locations can review the scale of this development in the northern suburbs. The 131-hectare site provides a defined footprint for the residential component alongside the tourism elements. Official project information outlines the delivery of the homes without additional unsubstantiated projections.

The Heights in Durack

The Heights in Durack by Urbex features seven stages with over 400 residential blocks. An eight-month civil construction program is already underway, and land sales are forecasted for early 2025. Buyers interested in this southern suburb can track the staged rollout through the developer's updates on block availability.

Holtze and Kowandi

New suburbs Holtze and Kowandi have been fast-tracked with construction start dates moved from 2026 to 2024. This adjustment supports accommodation of population growth, giving buyers in these emerging areas concrete start timelines to monitor.

Supporting Infrastructure

The $26.8 million Casuarina Aquatic and Leisure Centre forms part of a $46 million infrastructure program and is scheduled to open in mid-2024. The $150 million, 21-storey Darwin Civic Centre remains under construction in the CBD, with levels 15 and 16 expected to be finalized by January 2027 and the full project completed by 2028. These elements supply buyers with information on nearby facilities and civic works that affect liveability in the listed suburbs.

Prospective buyers can consult the project websites and government portals listed in the sources for the most recent updates on timelines and availability in these specific locations.

Sources Include (But not Limited to)

https://www.leepointdarwin.com.au/

https://www.dha.gov.au/development/current-residential-developments/lee-point

https://www.abc.net.au/news/2026-02-01/darwin-civic-centre-construction-site-update-after-worker-injury/106281930

https://infrastructure.nt.gov.au/project

https://www.darwin.nt.gov.au/council/news-media/darwin-to-benefit-from-46m-infrastructure-program

This article is general information only and is not personal financial or investment advice. Consider your own circumstances and seek licensed professional advice before making financial decisions.

References Sourced but Not Limited to:

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

The Daily Darwin is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.

The Daily Network · local news across AUS